Tregothnan Estate

Case Study - Tregothnan Estate, Truro

Tregothnan estate and Tea Plantation were looking to upgrade their existing boiler currently heating the estate offices.

Southwest Renewables Installed a Hargassner 200kW chip boiler to heat both the office buildings and the large Estate house. The task of routing the size and distance of pipe required called for a sympathetic and careful approach taking into account the origins of Tregothnan Estate date back to the 13th Century.